What is a statement of environmental effects?
The drawings show what you want to build. The statement of environmental effects explains what it does to everything around it.
What is a statement of environmental effects in NSW?
A statement of environmental effects is a report lodged with a development application in NSW. It sets out the likely environmental impacts of the proposal, how they were identified and the steps taken to protect the environment or lessen the harm. Designated development and State significant development need an environmental impact statement instead.
When a development application goes to a NSW council, a statement of environmental effects goes with it, and planners shorten it to SEE. The report explains the proposal and its likely effect on the site and its surroundings, along with the steps taken to limit any harm.
The drawings show the building. The statement explains how that building fits the planning controls and the neighbourhood, so the council has what it needs to weigh it.
When one is needed
The NSW application requirements list a statement of environmental effects as a document every development application must contain. Designated development and State significant development need an environmental impact statement instead, which is a longer and more detailed report.
A complying development certificate works differently. It is checked against the fixed standards in the code that applies, and the NSW list of documents for a complying development application does not include an SEE.
What it has to cover
The statement documents the environmental impacts of the development, how those impacts were identified, and the steps taken to protect the environment or lessen the expected harm. It also covers any matters set by guidelines from the Planning Secretary.
It carries drawings of the proposal in the context of the buildings around it, including the streetscape. Where the controls set building heights, height planes, setbacks or a building envelope, compliance with each one is marked on the plans, sections and elevations.
The matters the council weighs
The NSW planning department lists six matters a council has to consider under section 4.15 of the Environmental Planning and Assessment Act 1979:
- The plans and policies that apply, such as SEPPs, local environmental plans and development control plans
- The impacts on the natural and built environment, and the social and economic impacts in the area
- Whether the site suits the development
- Any submissions made about it
- Comments or approvals from NSW Government agencies
- The public interest
A well-made statement follows that list, so the council finds each answer where it expects to look.
What a strong statement includes
A useful SEE is written for its site. It names the zone and confirms the use is permitted there, then works through each control in the local plans and sets the proposal's figure beside it.
It deals with what neighbours care about, such as overshadowing, privacy, noise, traffic and parking, and backs each answer with a drawing or a report. Where the design departs from a control in the development control plan, the statement says so plainly and explains why the result still works.
On special-use accommodation
A group home, seniors housing or co-living project has to show that the use is permitted on the land. Some of these uses are permitted through the State Environmental Planning Policy (Housing) 2021 rather than the local plan, so the statement cites the instrument that allows it, as explained in what is the Housing SEPP.
Suitability of the site is one of the matters weighed, so the statement also shows how residents arrive, from the street and the parking space to a level front door.
Who prepares it
A town planner usually writes the statement, drawing on the architect's drawings, the survey and the consultants' reports, such as traffic, stormwater, arborist, bush fire or heritage reports where the site calls for them. What the survey has to show is covered in the site survey and what it must show.
Our team coordinates the consultants, documentation and certification requirements through to submission and approval.
Where it fits in our design stages
Submission is the last of our eight design stages, where the project takes its DA, CC or CDC pathway under the relevant SEPP. The pathway itself is chosen at feasibility, as set out in what planning pathways apply to special-use accommodation in NSW, and the value of meeting the council first is covered in pre-lodgement engagement with council.
By then the design has been through final development and final coordination, so the statement describes the building we intend to build.