Standards

The standard, by default.

NCC

National Construction Code, the structural baseline.

The NCC is the foundation every Made project starts from. Structural adequacy, fire safety, energy efficiency and amenity rules apply equally to a Made module and to conventional in-situ work.

The hybrid build does not change the NCC bar. It changes how the factory and site work converge to meet it.

Inside the method
A Made module's over-engineered yellow structural steel frame, the NCC structural baseline

BCA

Building Code of Australia, the practical layer.

The BCA is the practical application of the NCC, broken down into Class 1 (housing) and Class 2-10 (other buildings). Made's special-use work spans Class 1a, 2 and 3 depending on the cohort and the development typology.

Inside the method
Compliance overlay on a Made module facade illustrating BCA application

NDIS SDA Design Standard

SDA: the highest compliance bar in low-rise construction.

The Specialist Disability Accommodation Design Standard is the highest compliance bar in low-rise construction in Australia. Made builds to it as standard, one of the special-use streams it serves.

Building to that bar makes every other special-use stream over-compliant by default. The standard is not a ceiling for Made, it is the floor.

Inside the method
Interior of an SDA-compliant Made dwelling, resident at home in a designed space

Liveable Housing Australia

LHA, including the incoming changes.

LHA standards apply to every Made project as a baseline. Step-free entry, generous internal circulation, accessible bathroom layouts and reinforced wall zones are designed in from the schematic, not retrofitted at the end.

Inside the method
Flush level-entry threshold on a Made module, LHA-compliant by design

DA / CC / CDC

The planning pathway is chosen, never improvised.

DA, CC or CDC under the relevant SEPP. The pathway is set per project against the land, the local environmental plan, and the cohort. Statutory bodies engaged early. No mid-project surprises.

Inside the method
A Made single-storey group-home development on its site, planned under the relevant SEPP

Occupation Certificate

Closing the project, end to end.

OC documentation and handover are managed through one accountable party. The compliance chain that started at schematic carries through to the day residents move in.

Inside the method
11 Lucinda Avenue, a completed Made dwelling with level access, ready for Occupation Certificate handover