Two systems.
One result.
Two systems running at once. Modules built to a zero-tolerance standard in a climate-controlled factory, and site works prepared in parallel, meeting at the marriage to the millimetre. One accountable business, design through to handover.
The Numbers Behind The Method.
- Programme reduction
- 30 to 60 percent against conventional construction
- Manufacturing standard
- Zero tolerance, climate-controlled environment
- Transport engineering
- Modules over-engineered to withstand road transport. Structurally over-built for service life once installed.
- Concurrency
- Factory build and site preparation run in parallel
- Cure factor
- 28 days for concrete, built into the programme
- Accountability
- One business, design through to handover
Design programme
Eight stages, every project.
Schematic design
First architectural intent set against the brief, the site, and SDA where it applies.

Schematic design
First architectural intent set against the brief, the site, and SDA where it applies.

Design assessment
Schematic measured against feasibility, compliance, accessibility and the constraints of the cohort.

Design assessment
Schematic measured against feasibility, compliance, accessibility and the constraints of the cohort.

Draft development + SDA assessment
Drafting begins. SDA assessment threaded into the design rather than added at the end.

Draft development + SDA assessment
Drafting begins. SDA assessment threaded into the design rather than added at the end.

Draft coordination + SDA review
Disciplines coordinated. SDA review confirms accessibility and compliance hold through coordination.

Draft coordination + SDA review
Disciplines coordinated. SDA review confirms accessibility and compliance hold through coordination.

Draft review
Project-wide review of the drafted documentation. Constraints reconciled before final development.

Draft review
Project-wide review of the drafted documentation. Constraints reconciled before final development.

Final development
Resolution to coordinated, approval-ready documentation. Detail closed out across architecture, services and structure.

Final development
Resolution to coordinated, approval-ready documentation. Detail closed out across architecture, services and structure.

Final coordination
Final pass across all disciplines, ensuring nothing falls between the cracks before submission.

Final coordination
Final pass across all disciplines, ensuring nothing falls between the cracks before submission.

Submission
DA, CC or CDC pathway under the relevant SEPP. PCA liaison and statutory bodies engaged.

Submission
DA, CC or CDC pathway under the relevant SEPP. PCA liaison and statutory bodies engaged.

Construction programme
Six stages, in parallel.
Site preparation
Site works programmed back from delivery, less twenty-eight days for concrete cure.

Site preparation
Site works programmed back from delivery, less twenty-eight days for concrete cure.

Module fabrication
Climate-controlled, zero-tolerance build. Modules over-engineered for transport.

Module fabrication
Climate-controlled, zero-tolerance build. Modules over-engineered for transport.

Modular fit-out
Internal finishes and services completed inside the factory before transport.

Modular fit-out
Internal finishes and services completed inside the factory before transport.

The marriage
Delivery and installation. Factory modules meet in-situ works, to the millimetre.

The marriage
Delivery and installation. Factory modules meet in-situ works, to the millimetre.

Completion
Soft works, landscaping and external works.

Completion
Soft works, landscaping and external works.

Handover
Documentation closed out, keys handed over. One accountable party, end to end.

Handover
Documentation closed out, keys handed over. One accountable party, end to end.