What are holding costs on a development?

Holding costs buy nothing you can see. They are the price of a project that is not finished yet, and they run every month until it is.

What are holding costs on a development?

Holding costs are the costs of owning a site and carrying a project until it is finished and earning income. They include interest on land and construction finance, council and water rates, land tax, insurance, site security and the cost of the team running the project. They run every month, whether or not work is moving.

Holding costs are what a development costs you every month simply because it is not finished. They start when you take on the land and they stop when the project is sold or starts earning income, and none of that money goes into the building itself.

Developers tend to focus on land price and build rate, because those are the big numbers. Holding costs are smaller each month and they keep running, so a long programme can quietly move a feasibility.

What is in them

The largest item is usually interest, on the land loan from settlement and on the construction loan once it starts to be drawn. Lenders often add fees on the facility as well, charged on the limit whether or not it has been used.

Around that sit the costs of owning the site. Council rates, water rates, insurance, fencing and site security all keep running. In NSW, land tax is assessed on the land you hold at midnight on 31 December, so a project that stretches across another year end can pick up another assessment.

Then there is the team. Project managers, consultants on retainer and your own overhead all cost money for as long as the project is open.

Equity has a cost too. Money tied up in one site cannot be used on the next one, and a proper feasibility counts that.

Before construction and during construction

The holding period has two parts, and they behave differently.

Before construction, the land is held while the design and approvals run. The monthly cost is fairly steady, because the loan balance is not moving much.

During construction, interest climbs as the loan is drawn, so the months near the end of a project cost more than the months near the start. A late delay costs more than an early one for that reason.

How drawdowns work on a project with factory work is set out in how is construction finance drawn on a modular project.

How to model them

Build a month-by-month cash flow instead of one lump allowance. Enter the interest against the balance actually drawn in each month, then add the fixed monthly items and each annual charge in the month it falls due.

Then change the length of the programme and watch what moves. That gives you the real cost of a month for your project, because the number depends on your own loan and your own site.

What a shorter programme changes

Site preparation and module fabrication run in parallel in our method, which cuts build programmes by up to 60 percent. That reduction applies to the construction part of the holding period, when interest is running on drawn finance.

It does not shorten the approval period by itself, so we settle the planning pathway at feasibility. A shorter programme also brings forward the date the project becomes income-producing, which is a separate gain from the costs saved. The two are worked through in how Hybrid Volumetric Modular changes a development feasibility.

How it fits with the build price

The upfront figure for our method is higher than conventional construction, and so is the return on investment. The holding cost line is one of the reasons, which is why comparing build rates alone gives the wrong answer.

The same costs matter to a lender. Interest and contingency both have to survive the full programme, as covered in what is a construction contingency, and a shorter programme gives both less time to run out.