How do you modify a development consent in NSW?

A development consent can be changed after it is granted. The test is whether the changed project is still substantially the same development.

How do you modify a development consent in NSW?

You lodge a modification application with the consent authority under section 4.55 of the Environmental Planning and Assessment Act 1979. The Act sorts changes into minor errors, changes with minimal environmental impact and other changes. Every modification has to leave the project substantially the same development, and a larger change needs a new development application.

You change a development consent in NSW by lodging a modification application under section 4.55 of the Environmental Planning and Assessment Act 1979. The consent authority can approve the change only if the project, as modified, is substantially the same development as the one it approved.

Applications go through the NSW Planning Portal. A consent granted by the Land and Environment Court on appeal is modified under section 4.56 instead, and the same substantially the same test applies there too.

The three types

Section 4.55 sorts modifications by how much they change. The smallest, under section 4.55(1), corrects a minor error, misdescription or miscalculation, such as a wrong lot number on the consent.

Next is section 4.55(1A), for a change with minimal environmental impact. Moving a window that faces into the site, or adjusting an internal layout that affects nobody beyond the boundary, is the kind of change it is written for.

Everything larger falls under section 4.55(2). These are assessed much like a new application, and they are usually notified to neighbours in line with the council's community participation plan.

The substantially the same test

The consent authority compares the modified project with the one it approved, looking at the development as a whole. The courts have said that comparison is made in kind as well as by the numbers, so a change that keeps the floor area but alters what the building is or how it works can still fail.

If the change goes beyond that, a modification is the wrong tool and a new development application is needed. That is worth knowing before a design change is promised to anyone.

What the council weighs

For anything beyond a minor error, the consent authority considers the same planning matters it considered for the original application, along with the reasons it gave when it granted consent. Where another agency set terms for the original consent, such as the NSW Rural Fire Service on bush fire prone land, a section 4.55(2) modification goes back to that agency as well.

How that agency's approval works for special-use accommodation is covered in special-use accommodation on bush fire prone land in NSW.

Changes to a CDC or a Construction Certificate

A complying development certificate can be modified as well, but only if the changed project is still complying development. If the change takes it outside the standards, the project moves to a development application.

The Construction Certificate follows the consent. A detail change that stays inside the consent goes back to the certifier, while a change that steps outside it needs the consent modified first, as set out in what is a Construction Certificate in NSW.

What it means for a modular build

Modules are fabricated from final documents, and the factory and the site run at the same time. A modification that moves a wall, an opening or the footprint of a module has to be approved before the factory builds that module, or the work is done twice. The cost of a late change is set out in what happens if the design changes after fabrication has begun.

On an SDA project, a modified design also goes back to the SDA assessor, because the design certificate covers the design that was assessed.

The work before lodgement

Our design stages finish with a final pass across every discipline before submission, so the consent describes the building we intend to build and a modification stays the exception. The value of meeting the council before lodging is set out in pre-lodgement engagement with council.