Building on saline and reactive soil in Western Sydney
Clay moves and salt follows water. Both are tested before the base structure is designed, and both matter at a level front door.
How do you build on saline and reactive soil in Western Sydney?
Test the soil first, then design the base structure to suit. A geotechnical report classifies the site under AS 2870 for reactive clay, and a salinity assessment sets the concrete and masonry requirements. Exposure-grade brick, a continuous damp proof membrane and good drainage keep salt out, including at a level front door.
Building on saline and reactive soil in Western Sydney starts with testing the ground, then designing the base structure to suit what the tests find. Much of the Cumberland Plain sits on clay soils weathered from Wianamatta shale, and parts of the region also carry salt in the soil, so a site can bring both conditions at once.
Neither one rules out a project, and a modular build is no exception. They do change the footing design, the concrete, the brick and the detail at the front door.
Reactive clay
Reactive clay swells when it gets wet and shrinks as it dries, and the ground moves with it. AS 2870, the Australian Standard for residential slabs and footings, classifies a site by how much movement to expect, from Class A through S, M, H1, H2 and E, with Class P for problem sites such as deep uncontrolled fill.
The class comes from a geotechnical report and it decides the footing design. A larger Class 3 building is designed by the engineer on the same evidence. How that report fits with the set-out for modules is covered in how foundations work when the building is built off site.
Salt in the soil
Salt on its own does little harm. The damage starts when water dissolves it and carries it into a building, then evaporates and leaves crystals behind that push apart brick and mortar from the inside.
The NSW Government guide Building in a Saline Environment names three ways the water gets there: rising damp from the ground, falling damp from leaking gutters and roofs, and condensation. Water table, leaking pipes and over-watered gardens all feed the first one.
Councils in the region treat this seriously. Camden Council has its own policy for building in salinity prone areas, and it asks for a salinity management plan where the soil is more than mildly aggressive.
What to test
A site investigation for salinity usually measures electrical conductivity, pH and sulphate in soil samples, and the results give an exposure classification that sets the concrete strength and cover. The sampling should reach the depth the works will reach, because cut and fill can bring salty subsoil close to the surface.
That matters on a sloping block, where the ground is often cut to get a level entry. The test and the cut plan are read together, along with what is shown in the site survey and what it must show.
The base structure and the brick
In Hybrid Volumetric Modular, the part in contact with the ground is the conventional base structure, built on site while the modules are made. The state guide points to the things that keep that work durable: a damp proof membrane under the slab and around the footings, concrete placed without added water and cured properly, and enough cover over the reinforcement.
Brick below the damp course should be exposure class, which is the grade tested for salt attack. Cladding choices are covered in external cladding selection and durability. Above that sits the module, with a hot-dipped galvanised, powder-coated steel frame that is bolted together in the factory and held clear of the soil by the base.
The level front door
A dwelling with level access brings the ground right up to the floor, and that is where salt and accessibility have to be solved together. A damp course works only while nothing bridges it, and the guide lists garden beds, paving, render and mortar droppings as the usual ways it gets bridged.
So the level entry is designed as a drainage detail as well as an access detail. The building code allows a lower damp course height where paving falls away from the wall and a verandah covers it, which suits a covered arrival point. We set that detail at design, with the falls drawn, and we keep garden beds and irrigation away from the walls.
MADEmodular / MADEbetter.
MADEmodular / MADEbetter.