What is design for manufacture and assembly?

A factory can only build well what the drawings let it build well. DfMA makes how the building is made part of the design from the first line.

What is design for manufacture and assembly?

Design for manufacture and assembly, or DfMA, means designing a building around how its parts will be made and put together. Factory processes, transport, lifting and the connections on site are designed in from the first drawing, so the site has fewer decisions left to make and the factory repeats work it has already refined.

Design for manufacture and assembly, usually shortened to DfMA, means designing a building around how its parts will be made and how they will be put together. Decisions a builder would normally make on site, such as how a wall joins a floor or where a pipe goes, are made in the design instead, with the factory and the installation in mind.

The idea came from manufacturing, where products are designed so they are simple to make and quick to assemble. Construction took it up as more of the building moved into factories.

Two halves of one idea

Design for manufacture is about the factory. The parts suit the way the factory works, with repeated dimensions, standard components and work that can be done at a fixed station with access to both sides.

Design for assembly is about putting those parts together, with connections that are simple to make and easy to check, and few steps left for the site. Our module frames are hot-dipped galvanised, powder-coated steel, bolted at galvanised gusset plates. A bolted connection is simple to make and simple to check, which is the point of designing for assembly.

What it changes in the design

The size of each module is set by what can travel by road and be lifted into place, so transport and lifting are design inputs from the first sketch. The route and the load are covered in oversize loads and route assessment.

Transport shapes the structure too. Each frame is over-engineered to withstand road transport, and once installed that leaves it structurally over-built for its service life.

Services are planned so each module connects to the next one, and to the site, at set points. How that is coordinated is explained in how are services coordinated between the factory and the site.

Repetition and design quality

DfMA rewards repetition. A dwelling type designed once to the highest standard and repeated across a site lets the factory refine the same work with every module, so precision repeats itself. The value of that on a larger site is set out in multi-dwelling projects and the value of repetition.

The repetition sits in the parts a resident never sees. The plan, the facade and the materials still answer the site and the street, and design is never given up to hit a deadline or a budget.

Why it starts at the first drawing

DfMA only works when it is part of the design from schematic design onwards. A plan drawn first and adapted for the factory later carries compromises that a plan drawn for the factory from the start avoids.

That is why construction input flows through our eight design stages, as described in what is Early Construction Involvement. The people who will build the module shape it while it is still on paper.

The hybrid part

In Hybrid Volumetric Modular, DfMA governs the modules, and the base structure goes in on site, using the tried and tested materials of conventional construction. The two are married on site, and that marriage only works to the millimetre.

That is why the factory standard is zero tolerance. The base structure is set out to the same precision, so the modules land where the drawings put them.

Kaizen in the loop

Each project feeds the next. We review the time tasks take and ask staff and consultants for feedback every cycle, so the next design starts from a process that has already been sharpened.

MADEmodular / MADEbetter.

How we deliver. Discuss your project.

MADEmodular / MADEbetter.

Let's talk.

Special-use accommodation, made better.